Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13635594
| No.13635594
- Product Categories
- Friendly Links
| Information Name: | Which gas oil furnace, boiler Arts (certified), gas oil furnace |
| Published: | 2015-07-08 |
| Validity: | 0 |
| Specifications: | Any |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | [Gas] oil furnace, gas oil furnace gas consumption, gas oil furnace failure analysis, by the Arts Arts boiler boiler feed. Hebei Arts boiler limited liability company (www.yineng.cn), if demand, please contact customer service gas oil furnace problems today on the two illnesses for which to analyze and process, as follows. Wrong one: not burning stove. (1) Gas Show the gas pipeline is not smooth; incineration solenoid valve control circuit is not intact; burning solenoid valve is not action; incineration solenoid valve action, the valve is not a movement. View ways: running to the incineration furnace, burning the solenoid valve terminals by measuring, there is 220V voltage, remove the line in doubt. After the burning of the solenoid valve removed, the power, the solenoid valve back to action, the valve can be visually open, forced open the main valve after the bypass solenoid valve 300 000 kcal conducting oil furnace gas, gas thermal oil heaters, burning gas normal gas conducting oil furnace technical parameters, eliminate gas and burning solenoid valve illnesses maybe. (2) See Incineration Incineration electrode control line intact; incineration electrode probe is not active. View ways: running to the incineration furnace, burning at the electrode terminals have 220V voltage, after the burner apart, burning electrode terminals to incineration electrode line is normal, remove the burning question electrode line. Carefully observe the burning flame detector probe electrode and above some scale, measured with a multimeter probe disconnection grim 200,000 kcal conducting oil furnace gas, thereby determining the stove is not burning the reason is because the burning of electrode fouling causing interruption no burning signals. Approach: Polished burned with gauze electrode and the outer flame detector probe until the total eradication of soot, with a multimeter tests, all probes look no interruption condition. Hot climate gas oil boiler repair: 1, on the Special Climate my conduct sunstroke, water, lightning, wind and other effective measures. 2, reducing gas oil boiler construction site temperature difference and humidity difference, suppress shortened. 3, strictly control the construction of gas oil boiler with the ratio to ensure the strength of the concrete itself, the selection of the construction to prevent the occurrence of cracks shorten quality and short life issues when temperatures at night a little at the end. 4, on the plastic cracked concrete because it happens in a plastic condition, if control of the main factors to carry out the land does not become harmful gas oil boiler repairs. In the construction of a gas oil boiler tissue hand panel care, timely detection and timely treatment can solve hand side. About shrinkage cracking, it should be used as a common problem of quality control of the main gas oil boiler repairs management. Which gas oil furnace, boiler Arts (certified), gas oil furnace by Hebei Arts boiler limited liability company. Hebei Arts boiler limited liability company (www.yi-neng.cn) Hebei Cangzhou, industrial boilers and accessories leader over the years, the company implement the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs . Boiler leadership in the arts with the staff warmly welcome all inquiries negotiations to create arts boiler better future. |
Admin>>>
You are the 13251 visitor
Copyright © GuangDong ICP No. 10089450, Hebei Arts boiler limited liability company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13251 visitor
Copyright © GuangDong ICP No. 10089450, Hebei Arts boiler limited liability company All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

